project ID #

1

Complete regional assessment of water and sewer facilities

Strategy #
1.1
Strategy Description:

Identify needs and address water and sewer system affordability and sustainability

Project Lead(s):

LCLGRPB

Project Stakeholders:

Water Districts Sewer Districts Counties

Federal Funding

EDA

State Funding

ESD DOS

Local Funding

Counties

Project Cost Estimate
$100,001-$500,000
Regional

project ID #

2

Develop Hamlet Wastewater Feasibility Plan for Warren County. The plan would evaluate the feasibility and costs of establishing, modernizing, and expanding wastewater infrastructure to increase development opportunities in rural hamlets.

Strategy #
1.1
Strategy Description:

Identify needs and address water and sewer system affordability and sustainability

Project Lead(s):

Warren County

Project Stakeholders:

LCLGRPB APA

Federal Funding

NBRC

State Funding

DEC DOS

Local Funding

Warren County

Project Cost Estimate
$100,001-$500,000
Warren

project ID #

3

Support creation of First Capital Grant Fund to facilitate first expenses of expanding or establishing water/wastewater infrastructure

Strategy #
1.1
Strategy Description:

Identify needs and address water and sewer system affordability and sustainability

Project Lead(s):

APA

Project Stakeholders:

LCLGRPB ESD

Federal Funding

State Funding

ESD EFC USDA

Local Funding

Counties

Project Cost Estimate
$500,001-$1M
Regional

project ID #

4

Improve awareness of state and federal funding opportunities for improving infrastructure

Strategy #
1.1
Strategy Description:

Identify needs and address water and sewer system affordability and sustainability

Project Lead(s):

LCLGRPB

Project Stakeholders:

USDA EFC REP

Federal Funding

State Funding

Local Funding

LCLGRPB Counties

Project Cost Estimate
$0-$100,000
Regional

project ID #

5

Support coordination of inter-municipal stakeholders to facilitate implementation of the Regional Sewer Infrastructure Consolidation & Upgrade Report (Glens Falls, Queensbury, Kingsbury, Washington County Sewer District #2, Moreau)

Strategy #
1.1
Strategy Description:

Identify needs and address water and sewer system affordability and sustainability

Project Lead(s):

LCLGRPB

Project Stakeholders:

Glens Falls (C) Queensbury (T) Kingsbury (T) Washinton County Moreau (T) Warren County

Federal Funding

EDA USDA

State Funding

DOS EFC

Local Funding

Municipalities

Project Cost Estimate
$500,001-$1M
Regional

project ID #

6

New water treatment plant, Rouses Point

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Rouses Point (V)

Project Stakeholders:

LCLGRPB Clinton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Rouses Point (V)

Project Cost Estimate
$5M+
Clinton

project ID #

7

Drinking well improvements, Long Lake

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Long Lake (T)

Project Stakeholders:

LCLGRPB Hamilton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Long Lake

Project Cost Estimate
$100,001-$500,000
Hamilton

project ID #

8

Install new drinking well and expand water district, Warrensburg

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Warrensburg (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Warrensburg

Project Cost Estimate
$100,001-$500,000
Warren

project ID #

9

Drinking water system improvements and extension, Greenwich (V)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Greenwich (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Greenwich (V)

Project Cost Estimate
$5M+
Washington

project ID #

10

Village of Speculator public water system upgrades

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Speculator (V)

Project Stakeholders:

LCLGRPB Hamilton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Speculator (V)

Project Cost Estimate
$1,000,000-$5M
Hamilton

project ID #

11

Diamond Point Water District Improvements, Lake George

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Lake George (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Lake George (T)

Project Cost Estimate
$500,001-$1M
Warren

project ID #

12

Eagle Lake Water District formation and improvements, Ticonderoga

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Ticonderoga (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Ticonderoga (T)

Project Cost Estimate
$5M+
Essex

project ID #

13

Morrisonville water district update, Schuyler Falls

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Schuyler Falls (T)

Project Stakeholders:

LCLGRPB Clinton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Schuyler Falls (T)

Project Cost Estimate
$5M+
Clinton

project ID #

14

Bolton, Phase II and III - Water Source and Distribution System Upgrades

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Bolton (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Bolton (T)

Project Cost Estimate
$1,000,000-$5M
Warren

project ID #

15

Creek Road Water Main Replacement, Crown Point

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Crown Point (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Crown Point (T)

Project Cost Estimate
$1,000,000-$5M
Essex

project ID #

16

Drinking well improvements, North Hudson

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

North Hudson (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

North Hudson (T)

Project Cost Estimate
$100,001-$500,000
Essex

project ID #

17

Drinking water improvements, Jay

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Jay (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Jay (T)

Project Cost Estimate
$500,001-$1M
Essex

project ID #

18

Retrofit/replace aging drinking water purification systems with infrared purification systems, Whitehall (V)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Whitehall (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Whitehall (V)

Project Cost Estimate
$5M+
Washington

project ID #

19

Extend municipal water service to Hamilton County IDA site in Speculator

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Hamilton County

Project Stakeholders:

LCLGRPB Speculator (V)

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Hamilton County

Project Cost Estimate
$1,000,000-$5M
Hamilton

project ID #

20

Drinking water system improvements, including water mains replacements, Plattsburgh (C)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Plattsburgh (C)

Project Stakeholders:

LCLGRPB Clinton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Plattsburgh (C)

Project Cost Estimate
$5M+
Clinton

project ID #

21

Port Henry Water District Improvements, Moriah (T)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Moriah (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Moriah (T)

Project Cost Estimate
$500,001-$1M
Essex

project ID #

22

Blue Mountain Lake Water Project, including well and transmission lines, Indian Lake (T)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Indian Lake (T)

Project Stakeholders:

LCLGRPB Hamilton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Indian Lake

Project Cost Estimate
$1,000,000-$5M
Hamilton

project ID #

23

Pottersville Water Improvements, Chester (T)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Chester (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Chester

Project Cost Estimate
$1,000,000-$5M
Warren

project ID #

24

Water District Assessment and Improvements, Lake George (V)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Lake George (V)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Lake George (V)

Project Cost Estimate
$500,001-$1M
Warren

project ID #

25

Town water district creation and infrastructure expansion, Lake George (T)

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Lake George (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Lake George (T)

Project Cost Estimate
$1,000,000-$5M
Warren

project ID #

26

Upgrades to Keene Water District II

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Keene (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Keene

Project Cost Estimate
$1,000,000-$5M
Essex

project ID #

27

Upgrades to water system

Strategy #
1.2A
Strategy Description:

Assist local governments access funding for regional significant municipal drinking water improvements

Project Lead(s):

Argyle (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

USDA

State Funding

EFC HCR

Local Funding

Argyle (V)

Project Cost Estimate
$500,001-$1M
Washington

project ID #

28

Feasibility study to support installation of municipal sewer system, Salem

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Salem (T)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Salem (T)

Project Cost Estimate
$0-$100,000
Washington

project ID #

29

Upgrades to WWTP including chlorination, Speculator (V)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Speculator (V)

Project Stakeholders:

LCLGRPB Hamilton County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Speculator (V)

Project Cost Estimate
$1,000,000-$5M
Hamilton

project ID #

30

Replace aging pump station generators and pumps, Whitehall (V)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Whitehall (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Whitehall (V)

Project Cost Estimate
$500,001-$1M
Washington

project ID #

31

Collection System upgrades, Crown Point

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Crown Point (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Crown Point (T)

Project Cost Estimate
$1,000,000-$5M
Essex

project ID #

32

Expand sewer capability, Hudson Falls

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Hudson Falls (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA

State Funding

EFC HCR

Local Funding

Hudson Falls (V)

Project Cost Estimate
$1,000,000-$5M
Washington

project ID #

33

Complete improvements in Sewer District FE1A, including moving sewer main into public ROW and separation of storm and sanitary sewer, Washington Co

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Washington County

Project Stakeholders:

LCLGRPB Fort Edward (T/V)

Federal Funding

EDA NBRC HUD

State Funding

EFC HCR

Local Funding

Washington County

Project Cost Estimate
$5M+
Washington

project ID #

34

Wastewater System upgrade and expansion, including wastewater plant upgrades, Greenwich (V)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Greenwich (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA NBRC

State Funding

EFC HCR

Local Funding

Greenwich (V)

Project Cost Estimate
$5M+
Washington

project ID #

35

Development of Lakeshore Drive Sewer District and stormwater improvements, Lake George

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Lake George (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Lake George (T)

Project Cost Estimate
$5M+
Warren

project ID #

36

Bolton, Phase II Wastewater Treatment Plant and Distribution System Upgrades

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Bolton (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Bolton (T)

Project Cost Estimate
$5M+
Warren

project ID #

37

Lagoon upgrades and disinfection, Jay

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Jay (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Jay (T)

Project Cost Estimate
$1,000,000-$5M
Essex

project ID #

38

Installation of municipal sewer system, Cambridge (V)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Cambridge (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

EDA USDA

State Funding

EFC HCR

Local Funding

Cambridge (V)

Project Cost Estimate
$5M+
Washington

project ID #

39

Improvements to the Glens Falls Wastewater Treatment Plant, including Biosolids Remediation, and Combined Sewer Overflow (CSO)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Glens Falls (C)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA

State Funding

EFC HCR

Local Funding

Glens Falls

Project Cost Estimate
$5M+
Warren

project ID #

40

Expand sewer district, Warrensburg

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Warrensburg (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA NBRC

State Funding

EFC HCR

Local Funding

Warrensburg (T)

Project Cost Estimate
$5M+
Warren

project ID #

41

Updates to Water Pollution Control Plan and Sanitary Sewer System, Plattsburgh (C)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Plattsburgh (C)

Project Stakeholders:

LCLGRPB

Federal Funding

EDA USDA NBRC

State Funding

EFC HCR

Local Funding

Plattsburgh (C)

Project Cost Estimate
$500,001-$1M
Clinton

project ID #

42

Septic System Upgrades at Washington County Fairgrounds

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Washington County Fair

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

USDA NBRC

State Funding

ESD

Local Funding

Washington County Fair

Project Cost Estimate
$100,001-$500,000
Washington

project ID #

43

Complete planning for proposed Elizabethtown wastewater system, Elizabethtown (T)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Elizabethtown (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

USDA

State Funding

EFC HCR

Local Funding

Elizabethtown (T)

Project Cost Estimate
$0-$100,000
Essex

project ID #

44

Complete planning for proposed Village of Argyle wastewater system, Argyle (V)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Argyle (V)

Project Stakeholders:

LCLGRPB Washington County

Federal Funding

USDA

State Funding

EFC HCR

Local Funding

Argyle (V)

Project Cost Estimate
$0-$100,000
Washington

project ID #

45

Improvements to Caldwell Sewer District, Lake George (T)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Lake George (T)

Project Stakeholders:

LCLGRPB Warren County

Federal Funding

EDA USDA NBRC

State Funding

EFC HCR

Local Funding

Lake George (T)

Project Cost Estimate
$500,001-$1M
Warren

project ID #

46

Planning, design and construction of sewer separation and sewer improvements in the Village of Hudson Falls to improve water quality in the Hudson River. The project will include storm sewer separation and sanitary sewer rehabilitation. The separation of documented storm sewers from the existing combined sanitary sewer system.

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Washington County

Project Stakeholders:

LCLGRPB

Federal Funding

EDA USDA NBRC

State Funding

DEC EFC HCR

Local Funding

Washington County

Project Cost Estimate
$5M+
Washington

project ID #

47

Planning, design and construction of Septage Receiving, Storage and Sludge Drying. Construction of a new septage and liquid waste receiving station at the existing WCSD #2 WWTP. The new facilities would allow pretreatment to be provided to allow the septage and liquid waste to be added later into the treatment train.

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Washington County

Project Stakeholders:

LCLGRPB

Federal Funding

EDA USDA NBRC

State Funding

DEC EFC HCR

Local Funding

Washington County

Project Cost Estimate
$5M+
Washington

project ID #

48

Planning, design and construction of the Notre Dame Pump Station rehabilitation to maintain water quality in the Hudson River. Notre Dame Pump Station Rehabilitation.

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Washington County

Project Stakeholders:

LCLGRPB

Federal Funding

EDA USDA NBRC

State Funding

DEC EFC HCR

Local Funding

Washington County

Project Cost Estimate
$100,001-$500,000
Washington

project ID #

49

Upgrade municipal sewer system, Moriah (T)

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

Moriah (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA NBRC

State Funding

EFC HCR

Local Funding

Moriah (T)

Project Cost Estimate
$5M+
Essex

project ID #

50

Complete seasonal disinfection imrpovements at St. Armand WWTP

Strategy #
1.2B
Strategy Description:

Assist local governments access funding for regional significant municipal wastewater improvements

Project Lead(s):

St. Armand (T)

Project Stakeholders:

LCLGRPB Essex County

Federal Funding

EDA USDA NBRC

State Funding

DEC EFC HCR

Local Funding

St. Armand (T)

Project Cost Estimate
$1,000,000-$5M
Essex
> Clinton County
> Essex County
> Hamilton County
> Warren County